PROJECT INFO

Client: MBC Contracts / UK Power Network

Location: Kings Lynn

Year Completed: 2017

Background

The customer, UK Power Networks, is an electricity distribution network operator. They cover the South East, East, and London. The network has several locations within its network area.

Brief

MBC Contracts needed a partner to supply, install and commission a new, safety compliant, Velogate for controlled vehicle only exit. MBC Contracts chose Teksec to partner with them on this project.

Project installation

UKPN is pursuing an ongoing site security and general gate safety upgrade. Acting on behalf of MBC Contracts, we carried out an initial assessment of the site to ascertain the correct Velogate specification. We tailor-built and installed the required Velogate, facilitating a controlled vehicle only exit from the site. And we then ensured all relevant UKPN staff were trained on day-to-day operation of the installed equipment.

Project outcome

UKPN now operate a safety compliant controlled access gate at their Kings Lynn site. The site is able to operate safely and securely 24/7/365, meeting all regulatory requirements.

Kings Lynn Velo gate installation